Patrick Muller
Tue, 18 Jan 2005 17:16:53 -0800
Hi All,
Due to an outage on high voltage line all Swiss french part as been blackout around 45 minutes.
IXEurope GVA was not affected at all, due to our large capacity of fuel reserve and UPS batteries capacity.
No micro failure was occured during this outage.
Patrick
Patrick Muller
Datacenter Manager
IXEurope (Switzerland) AG
6, rue de la Conféderation
CH- 1204 Genève
Switzerland
Tel.: +41-(0)-22-544 98 00
Tel. direct: +41-(0)-22-544 98 31
Fax: +41-(0)-22-544 98 33
email: [EMAIL PROTECTED]