Dear authors,


I have read the draft. It covers the fundamental aspects of IPv6 adaptation for 
different PLC technologies. I found it is educational and useful.



Some detail comments are listed as follows for your consideration.



1. The last sentence of the first paragraph in the introduction is quite 
misleading. The AMI devices for water and gas meters are usually battery 
powered due to inconvenient cabling and safety issues. The term "long life 
time" is not correct for PLC, because PLC devices are always powered.

2. Section 3.4 is not clear enough. It's would be better to merge the content 
in the last paragraph to the three bullets. And there is not enough information 
for the L2 routing protocol of 1901.1.

3. In the neighbor discovery section, "RFC6775-update PLC devices include the 
EARO with the 'R' flag set when sending Router Solicitations and process Router 
Advertisements that include EARO to extract status information". The RS and RA 
should be NS and NA. The EARO is not in RS and RA.

4. More description on the functions of PCO, proxy coordinator, and PAN device 
is required in Section 5. And the terminology for "PCO" has conflict with IEEE 
1901.1, in which it stands for proxy coordinator, in the draft it stands for 
PAN coordinator. Thus this term could be misleading.



Best regards,

Martin

_______________________________________________
6lo mailing list
[email protected]
https://www.ietf.org/mailman/listinfo/6lo

Reply via email to