This is copy-and-past error. Sorry!

The correct wording is: "For the ECDSA secp256r1 verify
operation it took 205 msec on a Cortex-M7 running at 216 MHz."

Ciao
Hannes

On 07/25/2016 04:17 PM, Derek Atkins wrote:
> Hannes,
> 
> Hannes Tschofenig <hannes.tschofe...@gmx.net> writes:
> 
>> * What are the implications for power consumption?
>>
>> Here is my initial impression regarding the second aspect from a
>> performance analysis I ran on an LPC1768. It took 458 msec to do a
>> verify computation with optimization enabled* for a secp256r1 curve.
>> The LPC 1768 demo board uses a ARM Cortex-M3 CPU running at 96MHz.
>>
>> I also did a performance test with the STM DISCO-F746NG, which uses
>> a Cortex-M7 CPU running at 216 MHz. For the ECDSA secp256r1 verify
>> operation it took 10, 205 msec.
> 
> Is this Ten Thousand Two Hundred Five msec (e.g. 10+ seconds)?  Or is
> this Ten decimal Two Hundred Five msec?
> 
> -derek
> 

Attachment: signature.asc
Description: OpenPGP digital signature

_______________________________________________
Ace mailing list
Ace@ietf.org
https://www.ietf.org/mailman/listinfo/ace

Reply via email to