Hi All -

I have the opportunity to upgrade my TSM Server.

Current:
1 CPU 233mhz
512MB RAM

We are considering one of two situations:
OPTION 1:
Replace CPU with (2) 450mhz
Replace 512MB RAM with 1.5 GB RAM

OPTION 2:
Replace CPU with (4) 450mhz
Replace 512MB RAM with 1 GB RAM

Basically what I am asking is, Does TSM better utilize additional RAM or
additional Processors?
Thanks...


Marc Levitan

Reply via email to