Hi Wolf-Christian, if you have included your .pst files to subfile backup the TSM client is using the subfile feature in the following way. At the first time TSM is sending the base file to the server. Afterwards the changes will be send as a delta file by byte level (1 kB to 3 MB) or block level (3 MB to 2 GB) to the server. This delta files are used in a differential way. A maximum of 20 delta files can be made before TSM automatically is generating a new base file (full backup) again. But if the delta file exceeds 60 percent of the size of the base file a new base file will be made!!! That means, you have no control about the full backup!!! This will be made automatically by TSM if one of the above requirements is true. This is the reason why I didn�t work much with subfile backup. If you need some more detailed informations send me a short mail and I can send you a document with a more detailed describtion of the subfile process.
Many greeting Thomas Zitiere "Luecke, Wolf-Christian (K-DOI-44)" <wolf- [EMAIL PROTECTED]>: > > Hi, > > > > to backup the pst-files of our nt-servers we use the tsm-software > 4.2.1.16 > > and with that the feature adaptive subfile backup. > > It works quiet well but I want to know how I can set manualy the > boarders, > > when automaticly > > the adaptive subfile backup changes into a fullbackup. > > The second question is, can I prepare the adaptive subfile backup so, > that > > the next coming fullbackup > > is everytime at the weekend (timestamp)? > > > > best regards > > > > Mit freundlichen Gr��en > > > > Wolf-Christian L�cke > > > > K-DOI-44 > > Volkswagen AG Wolfsburg > > Storage Management > > e-business > > > > Tel.: 05361/9-22124 > > E-Fax: 05361/9-57-22124 > > > > E-Mail: mailto:[EMAIL PROTECTED] > > >
