Try to increase MESSAGEINTERVAL parameter in you server option file. You need recycle your TSM server than because off change take effect. Tom
-----Original Message----- From: ADSM: Dist Stor Manager [mailto:[EMAIL PROTECTED]]On Behalf Of Gerald Wichmann Sent: Monday, May 06, 2002 11:29 PM To: [EMAIL PROTECTED] Subject: schedule prompter My clients all run a preschedule command that can take 15 minutes or even longer to run. During this time, every 30 seconds, the TSM server tries to contact each client as follows: ANR2561I Schedule prompter contacting SC-S1-172-2 (session 281) to start a scheduled operation. With lots of clients, this really floods my activity log. Is there a way to increase the 30 seconds to a longer value? I'm not having much luck finding anything. Alternatively I suppose I could put the clients in prompted mode.. Gerald Wichmann Sr. Systems Development Engineer Zantaz, Inc. 925.598.3099 w 408.836.9062 c
