Steve, The best way would be to use "move data". You can change the destination for the current copygroup to new storage pool before you start moving data. This will give you enough time to move your data while the new backups are sent directly to new storagepool. You can also you "nextpool" but you might get in loop of data coming in to old pool and then migrated to new pool, if you have lot of data.
-----Original Message----- From: Stephen A. Cochran [mailto:[EMAIL PROTECTED]] Sent: Tue, June 25, 2002 6:02 AM To: [EMAIL PROTECTED] Subject: Adding a second library I've added a second 7337 library to our ADSM system (15 DLT robot with 2 drives). I've got the system seeing the library, and I have a new devclass defined with the new library. What I would like to do is have two of our stgpools (AFS_TAPE_POOL and COPYPOOL) we have defined use this new library, with the others staying in the original library. I can't change the devclass on a stgpool with the update stgpool command, so I'd have to create a new stgpool. What's the best way to get the data in the old stgpool out of that pool into the new pool? Should I just set NEXTpool to point to the new pool and set the migration level to 0%? Then when all the data is moved out of the original pool delete the pool? (This would give the added benefit of reclaiming all wasted tape space at the same time....) Steve Cochran Dartmouth College
