From: ADSM: Dist Stor Manager [mailto:[EMAIL PROTECTED] On Behalf Of Timothy Hughes >I Canceled an active backup session due to a possible problem, >There were two sessions active of the this node. I canceled >both then did a a q session and it was not there. Yet when I >look in the TSM server log it showed that the node completed >successfully? It also shows the backup completed successfully >when I display in operational results. > >What would be possible reason that a backup would complete >successfully after being canceled. FYI: the backup did not >complete before I cancelled it.
The SUCCESSFUL listing you see reflects the fact that the scheduled backup began successfully. There is no "official" posting as to the success or failure of a manual backup. >12/07/04 12:07:10 ANR2507I Schedule MIDNIGHT for domain PRODUCTION >started at 12/07/04 00:00:01 for node SPVAMER completed successfully at >12/07/04 12:07:10. (SESSION: 3275) See? -- Mark Stapleton ([EMAIL PROTECTED]) Berbee Information Networks Office 262.521.5627
