Timothy, what was the result from this schedule for today (12/15/04)? Regards
Ing. Jozef Zatko Login a.s. Dlha 2, Stupava tel.: (421) (2) 60252618 Timothy Hughes <[EMAIL PROTECTED]> Sent by: "ADSM: Dist Stor Manager" <[EMAIL PROTECTED]> 12/15/2004 01:43 PM Please respond to "ADSM: Dist Stor Manager" <[EMAIL PROTECTED]> To [EMAIL PROTECTED] cc Subject Re: Scheduler problem Hi Jozef, The time should have said 2/14/04 11:26:34 (dsmcad) Server Window Start: 00:00:01 on 12/15/04 Instead it said 2/14/04 11:26:34 (dsmcad) Server Window Start: 00:00:01 on 12/16/04 The two backup's that displayed this did not backup last night! (12/15) they will probably backup tonight. They are both displaying 2/14/04 11:26:34 (dsmcad) Server Window Start: 00:00:01 on 12/16/04 Which is the correct date now! Thanks Jozef Zatko wrote: > Timoty, > time specified in schedule, which is one second after midnight already was > (I mean today 12/15). Next one second after midnight will be on 16th. > Right? > > Regards > > Ing. Jozef Zatko > Login a.s. > Dlha 2, Stupava > tel.: (421) (2) 60252618 > > Timothy Hughes <[EMAIL PROTECTED]> > Sent by: "ADSM: Dist Stor Manager" <[EMAIL PROTECTED]> > 12/14/2004 05:48 PM > > Please respond to > "ADSM: Dist Stor Manager" <[EMAIL PROTECTED]> > > To > [EMAIL PROTECTED] > cc > > Subject > Scheduler problem > > Hello, > > I checked the DSMcad and it shows the next scheduled operation is for > 12/16/04 it should say 12/15/04. > > I killed the DSMCAD and restarted it, But it shows the next backup > schedule 12/16/04. These backups runs everynight. I need to get > this backup ready for 12/15/04. > > Anyone every have this problem with the schedule showing > the wrong date? This is happening on the two Backup sessions that > I cancelled this morning. > > AIX client 5.1.5 > TSM 5.2.3.5 > > Thanks for any help! > > $ tail dsmwebcl.log > Executing scheduled command now. > 12/14/04 11:26:34 (dsmcad) Next operation scheduled: > 12/14/04 11:26:34 (dsmcad) > ------------------------------------------------------------ > 12/14/04 11:26:34 (dsmcad) Schedule Name: MIDNIGHT > 12/14/04 11:26:34 (dsmcad) Action: Incremental > 12/14/04 11:26:34 (dsmcad) Objects: > 12/14/04 11:26:34 (dsmcad) Options: > 12/14/04 11:26:34 (dsmcad) Server Window Start: 00:00:01 on 12/16/04 > > 12/14/04 11:26:34 (dsmcad) > ------------------------------------------------------------ > 12/14/04 11:26:34 (dsmcad) Waiting to be contacted by the server. > ForwardSourceID:NT000549D6 ForwardSourceID:NT00054A96
