I am concerned about a 5.5.3 Linux server upgrade. I have upgrade 3-servers with no issues.
Now, the last server has been doing the "Upgrading TSM server database" for over 2.5-hours. None of the other upgrades took longer than 20-minutes. Yes this server has lots of objects (over 150M). I have been watching through "top" and it is always at or near 100% CPU utilization. Your thoughts?
