If it is in a primary storage pool, issue

Restore vol vome_name preview=yes

Then monitor for process completion.

Then check the activity log for anr1255 messages.
These will show what offsite volumes were unavailable but required for the 
restore.  
Then get those volumes onsite and checked into the library, and issue

Restore vol volume_name

This will marke the volume as destroyed, get the available data from copy 
storage pools, and place it on different volumes in the primary storage pool to 
which the volume being restored belongs.
Upon completion of the process, the old volume is marked empty, and all 
references to it are removed from the database.

Good luck.

-----Original Message-----
From: ADSM: Dist Stor Manager [mailto:[email protected]] On Behalf Of mik
Sent: Wednesday, January 29, 2014 8:15 AM
To: [email protected]
Subject: [ADSM-L] Bad tape question

Hi people,

I have a question, i have a bad tape with 5 file on i do an audit fix=yes the 
audit marked them to damaged and i try a move data after that and the move data 
failure directly after skipping damaged file.
Anybody have a solution to success the move data (or re scratch the tape and 
the tsm don't ask for damaged file on this tape)
I want to export node and i don't want that the export failed because he need 
the 5 damaged file.

See after the result of the audit and move

For the Audit
ANR4132I Audit volume process ended for volume A00015L3; 5 files inspected, 0
damaged files deleted, 5 damaged files marked as damaged, 0 files previously
marked as damaged reset to undamaged, 0 objects updated.
ANR0987I Process 52 for AUDIT VOLUME (REPAIR) running in the BACKGROUND
processed 5 items with a completion state of SUCCESS at 13:18:57.

For the move data
ANR2017I Administrator ADMIN issued command: MOVE DATA A00015L3 stg=tapepool2
reconst=yes
ANR1157I Removable volume A00015L3 is required for move process.
ANR0984I Process 57 for MOVE DATA started in the BACKGROUND at 13:45:56.
ANR1140I Move data process started for volume A00015L3 (process ID 57).
ANR1176I Moving data for collocation set 1 of 1 on volume A00015L3.
ANR1161W The move process is skipping a damaged file on volume A00015L3: Node
node_name, Type Backup, File space \\fold\f$, File name \folder\folder
- folder\101 folder - folder - file.jpg.
ANR1161W The move process is skipping a damaged file on volume A00015L3: Node
node_name, Type Backup, File space \\fold\f$, File name \folder\folder
- folder\101 folder - folder - file2.jpg.
ANR1161W The move process is skipping a damaged file on volume A00015L3: Node
node_name, Type Backup, File space \\fold\f$, File name \folder\folder
- folder\101 folder - folder - file3.jpg.
ANR1161W The move process is skipping a damaged file on volume A00015L3: Node
node_name, Type Backup, File space \\fold\f$, File name \folder\folder
- folder\101 folder - folder - file4.jpg..
ANR1161W The move process is skipping a damaged file on volume A00015L3: Node
node_name, Type Backup, File space \\fold\f$, File name \folder\folder
- folder\101 folder - folder - file5.jpg.
ANR1141I Move data process ended for volume A00015L3.
ANR0985I Process 57 for MOVE DATA running in the BACKGROUND completed with
completion state FAILURE at 13:45:57.

I wish anybody have a solution.

Regard, Mickael.

+----------------------------------------------------------------------
|This was sent by [email protected] via Backup Central.
|Forward SPAM to [email protected].
+----------------------------------------------------------------------

Reply via email to