What happens when the cellco fires up their gear? Do you get asked to move and move gracefully? Or do you have to do some kind of manual intervention?

How is the 450i/Medusa through trees?

On 5/20/20 10:31 AM, dave wrote:
I am fully deployed with about 800 subs and 40 Aps with pmp450/450i/450m.
I have seen some great numbers since moving to CBRS with total confidence with google.
Loving the new move to 30Mhz channels and 20mhz sizes.
We are seeing a celco fire up some of its gear though almost like a wall block into the metro portion of our coverage.



On 5/20/20 8:20 AM, Josh Luthman wrote:
It's due in 5 months.  No one says you have to be done between now and October.

Josh Luthman
Office: 937-552-2340
Direct: 937-552-2343
1100 Wayne St
Suite 1337
Troy, OH 45373


On Wed, May 20, 2020 at 9:08 AM Adam Moffett <dmmoff...@gmail.com <mailto:dmmoff...@gmail.com>> wrote:

    I recall 3 SAS outages discussed on this list.  One with Google
    and two with Federated.

    Whether it's production ready or not, these are the new rules we
    need to be using.


    On 5/18/2020 4:09 PM, Peter Kranz via AF wrote:

    Anyone deployed Cambium 450m gear under the new CBRS/SAS ruleset
    in an Urban environment have comments on how reliably your access
    points remain functional? i.e. receiving grants.. Should I
    consider this production ready at this point, or wait?

    Peter Kranz
    www.UnwiredLtd.com <http://www.unwiredltd.com/>
    Desk: 510-868-1614 x100
    Mobile: 510-207-0000
    pkr...@unwiredltd.com <mailto:pkr...@unwiredltd.com>


-- AF mailing list
    AF@af.afmug.com <mailto:AF@af.afmug.com>
    http://af.afmug.com/mailman/listinfo/af_af.afmug.com





--
AF mailing list
AF@af.afmug.com
http://af.afmug.com/mailman/listinfo/af_af.afmug.com

Reply via email to