On 8/22/20 11:36 AM, Robert wrote:
"We will microtrench across your driveway.  This will give you an expansion joint that, when filled, will possibly prevent expansion cracking"  ( but you would need to chamfer the edges)...


In Reno it's remove and replace the affected structure within the public right-of-way. Working in the public ROW doesn't grant some kind of go wild exception. I'd like to think of myself as a reasonable person, but if the city says you have to replace my concrete to work in the ROW I'm gonna insist on new since concrete work isn't cheap. I got lucky with a sewer line fix that went under the neighbor's gravel driveway, otherwise I would have owed them a new driveway (bounded by the existing expansion joints).

Couple years ago TMWA had a leak that required lots of digging in my yard. They have their own landscaping crew that comes in behind the work crews and puts everything back the way it was before.

--
AF mailing list
[email protected]
http://af.afmug.com/mailman/listinfo/af_af.afmug.com

Reply via email to