Yes, they are...we are heading back at 12:30...with drawings and background from original engineer.
On Thu, Jun 3, 2021, 11:18 AM Jan-GAMs <[email protected]> wrote: > What's that two inch conduit at bottom right corner of right-hand > cabinet? Is that the 480 incoming? > On 6/2/21 1:09 PM, Bill Prince wrote: > > That's a virtual switch. Does not need a physical connection to operate. > > I also don't particularly like the routing of the 480V cables. Would have > preferred they cam in via a separate conduit, but maybe that's just me. > > > bp > <part15sbs{at}gmail{dot}com> > > On 6/2/2021 11:23 AM, Jaime Solorza wrote: > > Look above where 480 comes in....the handle!!!!! They removed it bypassing > safety design to keep idiots from getting fried... > > On Wed, Jun 2, 2021, 10:54 AM Jaime Solorza <[email protected]> > wrote: > >> We just got hired to troubleshoot several lift station issues with VFDs, >> pumps and connectivity drop outs at Fort Bliss....we did not design any of >> these enclosures....they are sending us drawings and tech with lock out >> keys couldn't meet us until tomorrow... >> >> >> > > -- > AF mailing list > [email protected] > http://af.afmug.com/mailman/listinfo/af_af.afmug.com >
-- AF mailing list [email protected] http://af.afmug.com/mailman/listinfo/af_af.afmug.com