In any location that's "professional" or important enough to use that much
DIN rail, I wouldn't use or expect to see any Ubnt products (other than
Airfiber... even then it depends on link importance)

On Tue, Aug 3, 2021 at 4:55 PM Jaime Solorza <[email protected]>
wrote:

> We are replacing all the tough switches installed at wells and lift
> stations with Phoenix Contact switches and 24 VDC fed POE's.
> The TS-5s don't hold up well in our heat especially at lift station sites
> where enclosures are free standing and not inside buildings.
>
> --
> AF mailing list
> [email protected]
> http://af.afmug.com/mailman/listinfo/af_af.afmug.com
>
-- 
AF mailing list
[email protected]
http://af.afmug.com/mailman/listinfo/af_af.afmug.com

Reply via email to