In any location that's "professional" or important enough to use that much DIN rail, I wouldn't use or expect to see any Ubnt products (other than Airfiber... even then it depends on link importance)
On Tue, Aug 3, 2021 at 4:55 PM Jaime Solorza <[email protected]> wrote: > We are replacing all the tough switches installed at wells and lift > stations with Phoenix Contact switches and 24 VDC fed POE's. > The TS-5s don't hold up well in our heat especially at lift station sites > where enclosures are free standing and not inside buildings. > > -- > AF mailing list > [email protected] > http://af.afmug.com/mailman/listinfo/af_af.afmug.com >
-- AF mailing list [email protected] http://af.afmug.com/mailman/listinfo/af_af.afmug.com
