That is correct.

On Thu, Jan 23, 2025 at 3:53 PM Josh Luthman <[email protected]>
wrote:

> You can get the equipment back at the end of the contract, right?
>
> On Thu, Jan 23, 2025 at 4:47 PM Jason McKemie <
> [email protected]> wrote:
>
>> I'm putting in a bid to deliver a 1G symmetric dedicated circuit. What
>> are my options for PtP gear that can accomplish this? I was thinking AF11,
>> but their advertising is misleading as it looks like (at least in the US)
>> it can do just under 700M. This is a 12 month commitment, so Aviat is
>> probably out of the budget.
>>
>> -Jason
>> --
>> AF mailing list
>> [email protected]
>> http://af.afmug.com/mailman/listinfo/af_af.afmug.com
>>
> --
> AF mailing list
> [email protected]
> http://af.afmug.com/mailman/listinfo/af_af.afmug.com
>
-- 
AF mailing list
[email protected]
http://af.afmug.com/mailman/listinfo/af_af.afmug.com

Reply via email to