Look at mean well pb-1000-48. We just installed one, working fine so far. On Jan 5, 2015 6:06 PM, "Adam Moffett" <[email protected]> wrote:
> > Most of the equipment is 48v, so I'd want to stick with 48v if possible. > 260 Watt is the minimum, but it's possible future load could go up to > 500Watt. I'll check out Traco, thanks! > > How much more do you need? Traco TSP series has units that scale up to >> 600w at 24V if you want to stick with a DIN mountable solution. >> >> On Jan 5, 2015, at 5:54 PM, Adam Moffett <[email protected]> wrote: >>> >>> I've used the meanwell AD-155C for lots of small sites, but I have to >>> set up some soon that will require a lot more than 155Watts. >>> >>> What are my options without spending a zillion dollars on a rectifier? >>> I was actually looking at pairing a beefy 48v supply with a solar >>> controller, but I'm wondering about the longevity and reliability of that. >>> >>> >>> >
