Yea the rohn design is probably overkill for most sites. They design it
with worst possible soil in mind. If you want to change it the "right
answer" is get a PE to design it for you.
On May 12, 2015 10:18 AM, "Brandon Yuchasz" <[email protected]> wrote:

> So I am planning the replacement on one guy wire anchor next week. The
> anchor rod that goes into the concrete and other parts are on the way. I am
> lining up the small excavator concrete and so on. Rohn calls for a 6’x 4’x
> 1.5’ slab of concrete buried 4 feet under the surface of the ground. This
> is a 100’ Rohn 45. I am all for doing things right but that seems huge to
> me.  We have a very rocky soil up here and at one site actually anchored
> into bed rock. This site we won’t have that option but I suspect we will be
> digging through broken rock and dirt the entire way. Its an old mining area
> and this site sits where they pilled the “poor rock” that came out of the
> mine shafts. Its all over up here . They have not mined in this area in 100
> years so the soil is quite stable im not concerned about that. Just wanted
> to get your thoughts on the size of this anchor. We will have to mix the
> concrete on site no way to get a truck in.
>
>
>
>
>
> Best regards,
>
> Brandon Yuchasz
>
> GogebicRange.net
>
> www.gogebicrange.net
>
>
>