We pull back the foil on the apex cable over the sheath and make about 8 wraps of the drain around it then slide it into the connector. For tying to a surge suppressor I was having them leave an 8 inch tail of the drain also to tie to the ground, but it was too much work
On Tue, Aug 18, 2015 at 10:02 AM, Christopher Gray < [email protected]> wrote: > I'm going to try some Platinum Tools EZ connectors with their Pro/HD tool. > > When doing shielded wire for CPE and AP installations, is there a > preference for using internal or external ground connectors? > > Thanks - Chris > -- If you only see yourself as part of the team but you don't see your team as part of yourself you have already failed as part of the team.
