If you get enough panels and batteries you'll be fine.  If you cheap out
and don't get enough battery run time you'll hate yourself.  You're in
Florida so I think with the lack of winter and a proper budget (batteries)
you'll have no problems.


Josh Luthman
Office: 937-552-2340
Direct: 937-552-2343
1100 Wayne St
Suite 1337
Troy, OH 45373

On Thu, Sep 10, 2015 at 9:18 PM, Paul McCall <[email protected]> wrote:

> You are correct on your calculations… my spreadsheet formula was wrong J
> I just came up with 104 watts.
>
>
>
> I will ask the question naively..  why would you expect a headache?  Isn’t
> solar tried and true these days?
>
>
>
> I am dealing with every aspect of surge protection I possibly can at every
> level already, as this summer has been a monster for us on surges.  So, am
> doing the fiber up the tower in some cases, so I WILL have gear up there,
> which has its own sets of “concerns” regardless of how I power them.
>
>
>
> So, is a solar setup not reliable?   The “expert” claims that he seeing it
> more and more in the cellular world, up the tower
>
>
>
> Paul
>
>
>
>
>
>
>
> *From:* Af [mailto:[email protected]] *On Behalf Of *Josh Baird
> *Sent:* Thursday, September 10, 2015 9:10 PM
> *To:* [email protected]
> *Subject:* Re: [AFMUG] a new one, I think...
>
>
>
> I would at least allow 7.5W per ePMP radio (specs say 7.5 is typical, can
> spike to 10), and 10-15W per 320.  Maybe another 5-10w per MT radio.  That
> would be close to 100W.  You don't want to underestimate power consumption.
>
>
>
> Regarding your solar question.. I'm not sure, but that sounds like one
> hell of a headache.
>
>
>
> Josh
>
>
>
> On Thu, Sep 10, 2015 at 9:00 PM, Paul McCall <[email protected]> wrote:
>
> OK, so I am working with a grounding expert today, getting some opinions
> on a couple difficult towers, and one of the first suggestions he has for
> me as I mention that I am looking to do fiber / DC up this tower is… “Have
> you considered going solar up the tower?”  (to eliminate power surges
> completely from going up the tower)
>
>
>
> Hmmmm…
>
>
>
> So my brain starts wrestling with that…   Is it practical?
>
>
>
> Say on a tower with a Netonix DC powered switch running at 48v or 24v,
> powering  6 ePMP APs  and 2  320APs, 2 Mikrotik Bhs, and a small Mikortik
> router.
>
>
>
> Would be about 50 watts maximum according to my quick calcs.
>
>
>
> Not knowing anything about solar, has battery technology developed enough
> that it would be practical (size wise) to have enough batteries and a
> charge controller up in a box on a tower?  And what size solar panel would
> I need to drive that?
>
>
>
> Paul
>
>
>
> Paul McCall, Pres.
>
> PDMNet / Florida Broadband
>
> 658 Old Dixie Highway
>
> Vero Beach, FL 32962
>
> 772-564-6800 office
>
> 772-473-0352 cell
>
> www.pdmnet.com
>
> [email protected]
>
>
>
>
>

Reply via email to