I have a site we will initially feed with an epmp force 110 (connectorized
epmp) and serve two EPMPgps APs from it. To conserver space, I want to just
run all three radios off a gigabit syncinjector, but the epmp connectorized
is limited to 30 v.
Is there any issue running the EPMP gps APs on 24 volts?

-- 