As a generic answer, you can always use a cheap wall wart unregulated DC or AC output to feed telemetry units and just scale the result.

-----Original Message----- From: George Skorup
Sent: Saturday, April 09, 2016 8:15 PM
To: Animal Farm
Subject: [AFMUG] PacketFlux stand-by controller

Can the PacketFlux controller's mains monitor transformers take both
120v legs (4 total to monitor) or do I need to put in two external
240>120 step-downs?

Reply via email to