That's not really possible in this case.  What do you think about bonding
equipment to the tower vs a separate ground wire?  I certainly don't want
to make the equipment more of a target.

On Tue, May 9, 2017 at 4:29 PM, Jaime Solorza <[email protected]>
wrote:

> I am a firm believer in putting lightning rod at highest point of tower
> with direct cable run to buried ring or rod next to it.  Has worked well in
> our area.
>
> On May 9, 2017 3:25 PM, "Jason McKemie" <[email protected]>
> wrote:
>
> Wanted to get some opinions on grounding equipment at a tower site (on the
> tower).  The tower and shelter are all properly grounded, it's a
> solid-steel leg tower.  Right now I'm grounded via clamps to the tower.  My
> question is would it be better/worse/the same to run a copper ground cable
> up to the equipment?  It's going to end up being bonded to the same ground
> at the base, so I was thinking it wouldn't make a huge difference but
> wanted to see what others' experience was with this.
>
> TIA
>
> -Jason
>
>
>