I had a contractor pour 30 yard base for me for a 160 foot American Tower and he charged $7,000 for the concrete and labor. At the time the material cost was about half that and I think he included the rebar but not sure. I think your quote is high unless the "clearing" is a lot of heavily wooded/hard to get to area. If its just open field then I think hes charging way too much.
On Sun, Jun 11, 2017 at 12:00 PM, David Milholen <[email protected]> wrote: > I am looking for some insight on construction of a foundation for a Rohn > SSV150 10N Base. > > I would like to do a pier and pad type foundation for loose rocky soil. > Possibly slate or shale at 6' depth. > > I have a contractor that would clear a 100x100 lot and do the foundation > for around 17k. Is this out of the park or > > is this reasonable? > > > > -- >