So you guys convinced me to build on the dirt, much easier. Now what is the smallest span of guys I can get away with? I want to do 12 sections of 25G and I can guy it 3 or 4 times, I'm assuming 4 is better. I really want to keep the guys in as close as possible to save the valuable farming space I have, so what is the guy span from the tower base that would be recommended ? "how low can i go?" (without making any safety issues, this tower will only have 4 sectors and a 2ft dish at 40ft).
Thanks, TJ On Sun, Mar 25, 2018 at 3:32 AM, Lewis Bergman <[email protected]> wrote: > I would tell you that you are waisting money. 2 sections are going to cost > you a lot less and be a better long term solution than mounting a tower on > a building. You can use a house bracket near the top depending on your > building design and start your guy calculations from that point. > > > On Tue, Mar 20, 2018, 9:22 PM TJ Trout <[email protected]> wrote: > >> I'm building a 40x40 or possibly 50x60 steel building. I would like to >> install a guyed 25g on the peak (about 20ft peak from ground level with >> 16ft walls) >> >> If I guy off 4 times how high can I go? >> >> Any way to do 100ft or ten sections ? I'm assuming my guy span isn't far >> out enough..... >> >> I know what's on the drawings but I am looking for some real world >> feedback.... >> >> Thank you very much >> >> TJ >> >
