Darn, ( using polite word ) I have friends that would stack again and
sit by, armed, just looking for the opportunity to "discuss"... That
pissed off about private property trespassing out here in NV...
On 5/30/18 12:52 PM, Lewis Bergman wrote:
I think it was Wisconsin in winter where we stacked a 485 foot tower.
Next day we came to the site to finish cleanup and it had been cut
down. They were kind enough to leave a sign on the fence as to which
union local we should contact if we wanted to build it again. Thugs.
The moral of the story, Hire at least one union guy in a union state.
On Wed, May 30, 2018 at 1:31 PM Eric Kuhnke <[email protected]
<mailto:[email protected]>> wrote:
I would recommend joining the largest Facebook tower industry
specific groups (search groups for tower climbing, tower, etc).
There's about four of them that are really active, and between the
groups probably 30,000 members in total. Put out a message that
you're looking for a contractor and see what you get back.
On Fri, May 25, 2018 at 7:06 AM, Brandon Yuchasz
<[email protected] <mailto:[email protected]>> wrote:
I am looking for someone to stack two Rohn 65 towers in
Northern WI. Towers are 140’ and the site will be completely
prepped ahead of time. Concrete work will all be done and the
towers will be on site waiting. We have talked to one company
from Lower WI so far but they are doing a lot of large
cellular constructions this summer and priced these two in a
similar range. I took the quotes as they didn’t want to be
doing these small of jobs.
If anyone knows of someone of if anyone on the list is
interested in this they can hit me off list for more details.
If you are out of the area and willing to travel up give me a
shout as well might be able to make it work.
Thanks,
Brandon