Been reading a lot of Schank's work lately. Trying to relate it to HTN
Planning.
Let's assume Schank's MOP = HTN Method.
Then how do the remainder relate? Events, Episodes, Methods, Themes (TOPs,
TAUs).
I'm assuming the following:
Event = Action or Operator instance.Episode = aggregation of events; a plan
instance. Method = A plan type. A generalization of Episodes.Theme = goal
interaction instance.
Your thoughts?
~PM / Michael Miller.
------------------------------------------------------------------------------------------------------------------------------------------------Confidential
- This message is meant solely for the intended recipient. Please do not copy
or forward this message without the consent of the sender. If you have received
this message in error, please delete the message and notify the sender.
-------------------------------------------
AGI
Archives: https://www.listbox.com/member/archive/303/=now
RSS Feed: https://www.listbox.com/member/archive/rss/303/21088071-c97d2393
Modify Your Subscription:
https://www.listbox.com/member/?member_id=21088071&id_secret=21088071-2484a968
Powered by Listbox: http://www.listbox.com