Hi Clinton, > Steps to reproduce: > 1. Create a Requirement ticket. > 2. Go into the 'Edit' tab. > 3. Click on the "Create a new referenced 'Technical > Requirement'" (in my installation the story type is aliased to > 'Technical Requirement'). > 4. Fill in the ticket and submit. > > Behaviour: > 1. Child ticket is created, but the reference link from the parent > ticket is not created. > 2. Neither is the link the reverse direction. > > Expected Behaviour: > Links in both directions to be created for both the original and > child tickets. > > Note: > * Creating a link from an existing ticket works, i.e. if I type in > the ticket ID in the Reference # box, and hit 'Create Link'
I tried to reproduce this in the following way: * Changed the alias for user stories to read "Technical Requirement" * Created a new requirement * Switch to edit screen of the requirement * Click "Create linked 'Technical Requirement' * Fill something in & hit create For me everything is linked up correctly. Could you perhaps verify if this is also happening on a fresh installation? Also this might be a configuration issue, so if you could provide the configuration I could take a look at that. HTH, Martin --~--~---------~--~----~------------~-------~--~----~ Follow Agilo on Twitter: http://twitter.com/agiloforscrum ----- You received this message because you are subscribed to the Google Groups "Agilo for Scrum" group. This group is moderated by agile42 GmbH http://www.agile42.com and is focused in supporting Agilo for Scrum users. To post to this group, send email to [email protected] To unsubscribe from this group, send email to [email protected] For more options, visit this group at http://groups.google.com/group/agilo?hl=en -~----------~----~----~----~------~----~------~--~---

