Hi Clinton,

> Steps to reproduce:
>   1. Create a Requirement ticket.
>   2. Go into the 'Edit' tab.
>   3. Click on the "Create a new referenced 'Technical
> Requirement'" (in my installation the story type is aliased to
> 'Technical Requirement').
>   4. Fill in the ticket and submit.
> 
> Behaviour:
>   1. Child ticket is created, but the reference link from the parent
> ticket is not created.
>   2. Neither is the link the reverse direction.
> 
> Expected Behaviour:
>   Links in both directions to be created for both the original and
> child tickets.
> 
> Note:
>   * Creating a link from an existing ticket works, i.e. if I type in
> the ticket ID in the Reference # box, and hit 'Create Link'


I tried to reproduce this in the following way:
* Changed the alias for user stories to read "Technical Requirement"
* Created a new requirement
* Switch to edit screen of the requirement
* Click "Create linked 'Technical Requirement'
* Fill something in & hit create

For me everything is linked up correctly.

Could you perhaps verify if this is also happening on a fresh installation?

Also this might be a configuration issue, so if you could provide the
configuration I could take a look at that.

HTH,
Martin

--~--~---------~--~----~------------~-------~--~----~
Follow Agilo on Twitter: http://twitter.com/agiloforscrum
-----
You received this message because you are subscribed to the Google
Groups "Agilo for Scrum" group. This group is moderated by agile42 GmbH 
http://www.agile42.com and is focused in supporting Agilo for Scrum users.
To post to this group, send email to [email protected]
To unsubscribe from this group, send email to
[email protected]
For more options, visit this group at
http://groups.google.com/group/agilo?hl=en
-~----------~----~----~----~------~----~------~--~---

Reply via email to