Hi and thanks for the help. I proceeded exactly in the order given by installation and configuration guide, AGILO Quickstart in Help/Guide. As I don´t have any experiences with SCRUM (ok except the small things you learn during studdiing, but that doesn´t really count) I stuck to your guides and explanation materials.
In the meanhwile, upon the 4th installation, I still have the same problem. I can get the product backlog to work, when I delete the default ones at the beginning and then create new ones. Though sometimes I am not able to configure a created backlog. When I add it, sometimes it opens up the configuration page (description, global or sprint, etc.), but only approx. 1 out of 10 times. The other nine times it creates a gloabl backlog. Most of the time I am also not able to edit the existing backlog. I got a product backlog to work, I got a milestone backlog to work, but still the sprint backlog doesn´t want to work. That was in the third installation, now in the 4th everything is not working again. I am not able to reproduce at least getting product and milestone to work again. I cannot provide any other user information, as I am the only user for now. But I used a team member account and it is the same. By "you created a currently running sprint before?", do you mean that I created a sprint with a starting date before the current date? It is possible that I did that, but that was on first installation. Is that something I shouldn´t have done or not do at all? Error on my side? I would be glad to send you the project. Any special adress to send too or just yours? Thank you very much again, higly appreciated, thanks. On Jan 15, 3:52 pm, Felix Schwarz <[email protected]> wrote: > Hi there, > > this looks very strange. However I was unable to reproduce the problem. > Can you descripbe your process on a step-by-step basis? Please also > describe what your preconditions are (you created a currently running > sprint before?) > > Can you check if other users in your Agilo have the same problem? > If that doesn't help, please send us your environment folder so we can > have a look on our machines. > > fs > > smime.p7s > 4KViewDownload
-- Follow Agilo on Twitter: http://twitter.com/agiloforscrum ----- You received this message because you are subscribed to the Google Groups "Agilo for Scrum" group. This group is moderated by agile42 GmbH http://www.agile42.com and is focused in supporting Agilo for Scrum users. To post to this group, send email to [email protected] To unsubscribe from this group, send email to [email protected] For more options, visit this group at http://groups.google.com/group/agilo?hl=en