On Tuesday 09 March 2010, mfreu wrote:
> I found my mistake. I've added a contingent (for bug fixing) to the
> sprint.
> And the contingett was higher than the total capacity of all team
> members.
> After removing the contingent the y-axis scaling was correct.

I cannot reproduce the large scale on the y axis. I always get very 
small scales (0..1). Nonetheless, I think there should be a warning when 
a sprint's contingent exceeds the capacity of the team that is assigned.


Robert

-- 