i would add to the conversation that the new backlog needs:

1. the ability to edit before a sprint starts
2. a summary of story points for each sprint
3. a summary of hours for each sprint
4.CSV download from the sprint view.

these are all features that are found in the old backlog and we miss
them :(   You may well have already planned to put them in the next
release.

-Craig

On May 10, 9:23 am, Robert Buchholz <[email protected]>
wrote:
> On Monday 10 May 2010, akabat wrote:
>
> > It's more the new Sprint Backlog view that we don't like so much.
>
> That's too bad. It has become a lot more interactive, we've tried to
> make editing easier and not harder.
>
> > 1. I cannot set the Status. I can edit the remaining time or the
> > owner, but not the Status.
>
> You can reconfigure the backlog to display Status as a column. In the
> next release, you'll be able to use the in place JavaScript editor for
> all configured columns, so editing status works as well.
>
> > 2. In the old view the tickets were colored depending on the status
> > which made it well-arranged.
>
> Yeah, we haven't figured out a way yet to mark assigned / closed
> tickets. The next release will have buttons again to hide closed tickets
> or tickets owned by someone else. Does that solve your issue?
>
> > Now, all the tickets are in the same
> > color (black). By the way, can I configure the font colors or even
> >  the background colors? Configuring the background colors would be
> >  great!
>
> You can change colors by editing the CSS files. Have a look at
> newbacklog.css for that.
>
> >  3. The font size is smaller or is it only an optical
> >  illusion?
>
> No illusion. It has changed from 12px to 11px. Again, newbacklog.css is
> the place to edit theme internals.
>
> > So there's no possibility to open by default the old view? Maybe by
> > renaming some files in the installation?
>
> No, there's no easy way I can think of. I'd much rather work with you to
> make the new backlog great so you don't need the old backlog anymore
> because you miss nothing about it.
>
> Regards
>
> Robert
>
> --
> --
> Follow Agilo on Twitter:http://twitter.com/agiloforscrum
> Please support us by reviewing and voting 
> on:http://userstories.com/products/8-agilo-for-scrumhttp://ohloh.net/p/agilo-scrumhttp://freshmeat.net/projects/agiloforscrum
>
> You received this message because you are subscribed to the Google
> Groups "Agilo for Scrum" group. This group is moderated by agile42 
> GmbHhttp://www.agile42.comand is focused in supporting Agilo for Scrum 
> users.To post to this group, send email [email protected]
> To unsubscribe from this group, send email 
> [email protected]
> For more options, visit this group 
> athttp://groups.google.com/group/agilo?hl=en

-- 
--
Follow Agilo on Twitter: http://twitter.com/agiloforscrum
Please support us by reviewing and voting on: 
http://userstories.com/products/8-agilo-for-scrum 
http://ohloh.net/p/agilo-scrum 
http://freshmeat.net/projects/agiloforscrum

You received this message because you are subscribed to the Google
Groups "Agilo for Scrum" group. This group is moderated by agile42 GmbH 
http://www.agile42.com and is focused in supporting Agilo for Scrum users.
To post to this group, send email to [email protected]
To unsubscribe from this group, send email to
[email protected]
For more options, visit this group at
http://groups.google.com/group/agilo?hl=en

Reply via email to