Suppose my building has some 400 floors (I guess, some building will
have that many).

What would be the best algorithm to schedule the elevator system for
such huge number of floors?

--

You received this message because you are subscribed to the Google Groups 
"Algorithm Geeks" group.
To post to this group, send email to [email protected].
For more options, visit this group at 
http://groups.google.com/group/algogeeks?hl=en.


Reply via email to