Can be done by any standard disk scheduling methods.. i guess

On Tue, Jun 14, 2011 at 2:01 PM, Akshata Sharma
<[email protected]>wrote:

> Design an elevator system for a 100 story building. Address all issues,
> like number of elevators, speed of each (Not numerically), waiting times
> etc. There would be 100-200 people living/working on each floor. (You don't
> need to discuss the traffic patterns.)
>
> --
> You received this message because you are subscribed to the Google Groups
> "Algorithm Geeks" group.
> To post to this group, send email to [email protected].
> To unsubscribe from this group, send email to
> [email protected].
> For more options, visit this group at
> http://groups.google.com/group/algogeeks?hl=en.
>

-- 
You received this message because you are subscribed to the Google Groups 
"Algorithm Geeks" group.
To post to this group, send email to [email protected].
To unsubscribe from this group, send email to 
[email protected].
For more options, visit this group at 
http://groups.google.com/group/algogeeks?hl=en.

Reply via email to