Can be done by any standard disk scheduling methods.. i guess On Tue, Jun 14, 2011 at 2:01 PM, Akshata Sharma <[email protected]>wrote:
> Design an elevator system for a 100 story building. Address all issues, > like number of elevators, speed of each (Not numerically), waiting times > etc. There would be 100-200 people living/working on each floor. (You don't > need to discuss the traffic patterns.) > > -- > You received this message because you are subscribed to the Google Groups > "Algorithm Geeks" group. > To post to this group, send email to [email protected]. > To unsubscribe from this group, send email to > [email protected]. > For more options, visit this group at > http://groups.google.com/group/algogeeks?hl=en. > -- You received this message because you are subscribed to the Google Groups "Algorithm Geeks" group. To post to this group, send email to [email protected]. To unsubscribe from this group, send email to [email protected]. For more options, visit this group at http://groups.google.com/group/algogeeks?hl=en.
