Hi Sabine,

I have just seen that there is an IPR discloser with respect to this draft on the ipr-announce list(doesn't show up in the ipr-announce archive yet):
"
Dear Sabine Randriamasy, Nico Schwan:

An IPR disclosure that pertains to your Internet-Draft entitled "Multi-Cost ALTO" (draft-randriamasy-alto-multi-cost) was submitted to the IETF Secretariat on 2011-10-10 and has been posted on the "IETF Page of Intellectual Property Rights Disclosures" (https://datatracker.ietf.org/ipr/1628/). The title of the IPR disclosure is "Alcatel-Lucent's Statement about IPR related to draft-dandriamasy-alto-multi-cost-03."");

The IETF Secretariat".


Can you give some information about it to the ALTO WG?

Thank you,

  Martin


On 11/09/2011 04:26 PM, Sabine Randriamasy wrote:

Hi,

In the last version of draft Multi-Cost ALTO, Section deals with the
representation of 1 Cost Type taking multiple values. A related use case
is given in section ยง5.3. See
http://tools.ietf.org/html/draft-randriamasy-alto-multi-cost-05.txt

An example is a proposed Cost Type called "Path Occupation Cost" (POC)
that takes different values at different times.
The cost values of POC are represented with a JSONArray. The draft
proposes to qualify such a representation with the "dynamic mode".

The idea is to use this value table for planning purposes, to provide
guidance on which time periods are more suitable to operate data
transfers. An analogy can be found with train plan costs, classified wrt
trafic intensities (rush hours, vacation departures, ...) and
represented with e.g. colors or scalar values. These values can be used
to plan the travel period and ticket purchase, wrt the purpose /
emergency of the trip.

The class/cost values in the "dynamic mode" aim to be incentives, to
optimize the network occupation, more than trying to be some statistical
representation, although they stem from empirical knowledge.

Such Costs MUST be representable with single values, in either
"numerical" or "ordinal" modes. Either if only a "static" value is
needed of provided. Or when rapidly (down to couple of minutes) changing
values are available via new ALTO queries.

Are there any objections, suggestions, thoughts?

Thanks
Sabine




_______________________________________________
alto mailing list
[email protected]
https://www.ietf.org/mailman/listinfo/alto

Reply via email to