---------- Forwarded message ----------
From: Jensen Zhang <[email protected]>
Date: Fri, Jul 17, 2015 at 7:39 PM
Subject: Process of IETF'93 interop
To: IETF ALTO <[email protected]>, "Y. Richard Yang" <[email protected]>
Cc: Wendy Roome <[email protected]>, "Gurbani, Vijay K (Vijay)" <
[email protected]>, Young Lee <[email protected]>, Greg
Bernstein <[email protected]>, Jan Seedorf <[email protected]>,
Xiao Lin <[email protected]>, Haoran <[email protected]>, Shu Dong <
[email protected]>, "G. Robert Cheng (Huawei)" <[email protected]>


Dear all,

Following is the process of IETF'93 interop day. If you have any problems,
please contact with our volunteers.

Volunteers:
"Jensen" <[email protected]>
"Xiao Lin" <[email protected]>
"Haoran" <[email protected]>
"Shu Dong" <[email protected]>
"G. Robert Chen" <[email protected]>
Outline:

Below is a brief guide of ALTO test process. You will find following
information in the guide:


   1. How to login to the start platform and what should be prepared by
   local and remote participants before the Interop day?
   2. The details of the test on interop-day.

 ------------------------------
Preparation: Before Interop-day

   1. The interop volunteers have registered a IRC channel (
   #alto-interop@freenode
   <http://webchat.freenode.net/?channels=alto-interop>). Please make sure
   you have an IRC client and be able to connect to the IRC channel before the
   interop-day.
   2. Each server participant should deploy its ALTO server with a public
   IP.
   3. Please download the test template from here:
   
https://docs.google.com/document/d/1irUuS40aydX5hxQIexz1PTIcnYOJRBj_OYB2lXa3vd8/edit?usp=sharing
   .

Steps: On Interop-day Step 1. Start

   1. Please login to the IRC channel (#alto-interop@freenode
   <http://webchat.freenode.net/?channels=alto-interop>), and each
   participant please announce yourself.
   2. Hearing all announcements, test chair will allocate a test ID (server
   A, .. client B) for every participant.
   3. Each server participant posts to the IRC its entry IRD.
   4. The test chair will continue to announce the matching of clients and
   servers.

Step 2. Test

   1. Upon the announcement of a client-server matching, a google doc for
   the matching is created and announced on the IRC.
   2. The corresponding client participant will start to run its client to
   test the corresponding server.
   3. Test results will be recorded in the google doc. For a template of
   the good doc, please see
   
https://docs.google.com/document/d/1irUuS40aydX5hxQIexz1PTIcnYOJRBj_OYB2lXa3vd8/edit?usp=sharing
   .
   4. After finishing testing, please post to the IRC to let the test chair
   know.

Step 3. Summary of Results

   1. After all the tests finished, client participants should send test
   reports to the volunteers. Volunteers will summarize the results.
   2. The WG chair may report the summary results in the WG meeting next
   day.



--
Jensen, Xiao, Haoran, Shu, Robert
_______________________________________________
alto mailing list
[email protected]
https://www.ietf.org/mailman/listinfo/alto

Reply via email to