Maybe I missed it, but the draft "names" many metrics, it doesn't define them except in the most general way. No two entities could build comparable measurement systems that produce equivalent results with the specs in the draft. This is one main purpose of the registry.
Al From: ippm [mailto:[email protected]] On Behalf Of Gao Kai Hi Mirja and all, Personally I think the metrics in draft-wu-alto-te-metrics can be registered to IPPM following the process introduced in the IPPM drafts. If there are already some metrics with similar definitions, draft-wu-alto-te-metrics can still define the corresponding cost-metric/cost-mode values uesd in ALTO and have the registered IPPM metrics as references.
_______________________________________________ alto mailing list [email protected] https://www.ietf.org/mailman/listinfo/alto
