Folks: During the IESG review of cost-calendar, substantial comments were
made that requires a second WGLC for this draft.  Pursuant to the second
WGLC, we will resend the draft to the IESG.

The IESG comments are captured in [1].  The authors of cost-calendar have
revised the draft to address these comments and the new draft (version -10)
is available at [2].

This email serves as a second WGLC for cost-calendar and will run from Mon,
Feb 11 2019 to Mon, Feb 25 2019.  During this two week period, please
examine carefully the revised version and post any comments or discussions
to the list, even if you have no comments, a simple email to the list
saying that you have examined the changes and the draft is ready to proceed
is helpful.

To help you save time, you can examine the diffs between -09 and -10 at [3].

Thank you.

[1] https://datatracker.ietf.org/doc/draft-ietf-alto-cost-calendar/ballot/
[2] https://datatracker.ietf.org/doc/draft-ietf-alto-cost-calendar/
[3] https://tools.ietf.org/rfcdiff?url2=draft-ietf-alto-cost-calendar-10.txt
_______________________________________________
alto mailing list
[email protected]
https://www.ietf.org/mailman/listinfo/alto

Reply via email to