On Jan 25, 2001, [EMAIL PROTECTED] wrote:

> problem is that when i use "strategy nofull" amanda is only performing
> level 1 backups.

As per the documentation :-)

Maybe incronly is what you want?

>          I once read something about a patch that could allow me to
> control the backup levels in the way i want to, is there such a thing ??

There was, a long time ago.  But it was gross and unreliable, so it
was never installed.

> Another question, does anybody know if there is any problem on
> performing (forcing) a level 0 backup and in the next 3 days let
> amanda perform only level 1 backups, will this screw my backup
> integrity, do you think i will be able to restore the entire backup??

No problem with that.  Note that, for a complete restore, you'll only
want the level 0 and the latest level 1.

-- 
Alexandre Oliva   Enjoy Guarana', see http://www.ic.unicamp.br/~oliva/
Red Hat GCC Developer                  aoliva@{cygnus.com, redhat.com}
CS PhD student at IC-Unicamp        oliva@{lsd.ic.unicamp.br, gnu.org}
Free Software Evangelist    *Please* write to mailing lists, not to me

Reply via email to