On Wed, 10 Oct 2001 at 11:38am, Stephen Carville wrote

> dumpcycle     7 days
> runspercycle  10
> tapecycle     12 tapes

> Backups are run Monday thru Friday. I figure this setup will give me a
> full backup every Monday. Is that right?

If backups are only run Mon-Fri (5 days), and your dumpcycle is 7 days (1
week), then your runspercycle should be 5, not 10.  Runspercycle is how
many runs per dumpcycle, not tapecycle.

> Now how do I configure amanda to do differential backups (level 1) on
> Tuesday thru Friday?  One email I found in the archives suggested
> setting bumpdays to 4 but wouldn't that mean level 0 for four days?

You're trying to force amanda into your schedule (full Monday,
incremental otherwise).  The way amanda expects to be run is to be given
the parameters above, and then be left alone to set her own schedule of
full and incrementals within those parameters.  IOW, she'll try to balance
out the backups so that each night's are about the same size as the
previoius nights while making sure she does (in your case) level 0 of each
FS at least once a week.

I haven't played around with bump settings, so I can't help there.  I can
just say that, unless there's a *really* compelling reason, it's best to
let amanda set her own schedule.

-- 
Joshua Baker-LePain
Department of Biomedical Engineering
Duke University

Reply via email to