We have an SDLT drive that we'd like to use for full backups, but a small 
DDS2 drive for incrementals. The incrementals tend to be very small since 
we're a small research group, so it's a waste to do incrementals to the super 
large SDLT tapes.

  What I have setup now is 2 configurations, 1 that does a normal amanda 
thing for 4 days of the week, and a forced full on the fifth day so that I 
can use 

  However, since amanda attempts to run the full backup across the dumpcycle, 
this is going to lead to an overflow of the DDS2 drive eventually. What I am 
wondering is if I can fool amanda. If I tell the "incremental" config file 
that the dumpcycle is 5 days, and that runspercycle is 4, then do a full 
backup on Monday, will Tuesday through Friday not do any level 0 backups 
(provided there isn't a major change in the contents of the machines)?

  Or, should I set dumpcycle and runspercycle to some large number, like 1000 
days? It seems that setting dumpcycle and runspercycle up that high will 
cause it to only do incrementals, but I could be confused as to how amanda is 
calculating what level dump to do on any given night.

-- 

Chris Dahn, SERG Code Ninja
  3141 Chestnut St.
  Attn: MCS Department
  Philadephia, PA  19104
  Office: 215.895.0203
  Fax: 215.895.1582

<->Software Engineering Research Group<->
Feel the SERG!
http://serg.mcs.drexel.edu/
CAT 186, The Microwave
http://pgp.mit.edu:11371/pks/lookup?search=Christopher+Dahn&op=index

Reply via email to