On Fri, May 31, 2002 at 02:25:03PM -0400, David Chin wrote:
> 
> However, I seem to be having trouble with this.  I've been running with a 7 
> tape tapecycle, and a dumpcycle of 5 days, and runspercycle of 5days.  I 
> recently changed it to (9 tapes, 7 days, 7 days).  After modifying the 
> config on Sunday (before the level 0 was to be made), I forced level 0 
> backups.  Unfortunately, the force didn't work.  (No, not in the Star Wars 
> sense, either.)
> 
> My less-frequently-changing filesystems get dumped at level 1, but 
> /home keeps getting dumped at level 2; the last level 1 was on Sat May 25.

Once the level goes to a higher number I believe it will not go back
to a lower level until the next level 0.
> 
> Ach.  I guess I have a general question:  What's the right procedure to 
> switch backup configs in the way that I describe above, i.e. changing the 
> cycle periods.

I don't see what problems you expect.  Nor do I see anything else to do
except make the config change and introduce the new tapes.

BTW runspercycle is unitless, not 7days, just 7.
-- 