Tom,

> The logs gave me this:
> 
> NOTES:
>   planner: Incremental of delta.eduline.be:hda3 bumped to level 2.
>   planner: Incremental of delta.eduline.be:hda4 bumped to level 2.
> 
> 
> Incremental?  I don't want incremental backups, I want a FULL backup. 
> And what are these "levels" in combination with the incremental term?

A level 1 incremental includes everything that has changed since the last 
full backup. A level n, for n>1, includes everything that has changed since
the last level n-1 incremental.

Note that the "bumped to level x" does not necessarily mean a level x 
incremental has actually been performed. Amanda may have reverted to a full
backup anyway - you need to look further down in Amanda's mail to
determine that. (There should be a table that contains all backup areas 
with their respective levels, sizes, compression ratios and so on.)

However, level 2 is only ever considered if there exists a level 1 incremental
that is newer than the last full backup, so you may have another problem
there.

Ansgar Esztermann

-- 
Institut fuer theoretische Physik II    | Geb. 25.32.02                           
Heinrich-Heine-Universitaet Duesseldorf | +49-211-8112059 (phone)
Universitaetsstr. 1                     | +49-211-8112262 (fax)
D-40225 Duesseldorf, Germany            | 

Reply via email to