hi again...
i need a little help in setting up my dumpcycles.
i want to do backups over a period of 4 or 8 weeks with a full dump once per
week (monday).
is it right, that the length of the backup-period has nothing mutch do do
with the length of the dumpcycle and the runspercycle?

so:
dumpcycle 7 days                #
                                #
runspercycle 7          # hmmm, the 8 run is a full dump amd the cycle starts
again??
                                #
tapecycle 75 tapes      # 56 tapes normal. ok, i need 2 tapes for the full
                                # dumps and some tapes for errors
                                #
runtapes 2                      # if we need 2 tapes for the full dump, the changer 
takes
                                # the next tape

seems to be a good configuration for my need's.
any other sugestions??

regards

Patrick Schumacher  |  technical department

phone +49 (0)4192-8794 -440  |  fax -290  |
easynet DV GmbH  |  Achtern Dieck 9  |  24576 Bad Bramstedt

# easynet is part of the easynet group plc     |  www.easynetgroup.net


Reply via email to