I want to keep my cycles as short as possible so I can take a small subset of my tapes offsite for disaster recovery. I do dumps 5 nights a week. I was hoping to have a cycle of 3 days and 3 dumps per cycle, but with this config it always tries to do level 0’s on everyone every Monday.

 

Is there a way I can tell the system to ignore weekends completely?

 

JLM

 

 

Jeremy Mordkoff

Tatara Systems

978-206-0808 (direct)

978-206-0888 (fax)

 

Reply via email to