I'm setting up an amanda system, and I'm a little confused by the
jargon. What I'm trying to do is one full backup a week (on Fridays) and
partial backups every other weeknight. I want to operate four weeks of
tapes in rotation, so at any time we have four weeks of backup down to
the granularity of one day.

Am I right in thinking that this is a dump cycle of 7 days, with 5
runs per cycle and 4 tapes per run? Sorry if this is alarmingly obvious,
I'm pretty new to all this :)

Alex
-- 
Mail: Alex Page <[EMAIL PROTECTED]>
Real: Systems/Network Assistant, Epidemiology Unit, Oxford
Tel:  01865 302 223 (external) / 223 (internal)
PGP:  8868 21D7 3D35 DD77 9D06  BF0A 0746 2DE6 55EA 367E

Attachment: msg17893/pgp00000.pgp
Description: PGP signature

Reply via email to