On Friday 08 August 2003 02:44, Sarah Nordstrom wrote: >I'm setting up Amanda here, and would like someone with a bit more >experience than me to look over this and say if it looks decent. > I'll have someone (me :) ) onsite 4 days out of every 8 to change > tapes (i.e. days 1-4 tape changes can happen, days 5-8 tape changes > will not happen), which is not ideal, but that's how it's going to > work out. I'm thinking that I can run backups to tape the 4 days > when changes happen, and let backups build up in the holding disks > on days when tapes do not get changed? The plan right now is for > an 8 tape set, what determines the best dumpcycle to use? (By the > way, an autoloader is out of the question for now.. eventually, > this will likely be the best solution though.. someone needs to > invent an autoloader that'll fit in a 1U box ;) ) >Any comments appreciated :) > -- Sarah
First, I don't see anything attached for us to look over, and my magic twanger is on the fritz. Second, is the tape big enough to be able to hold 5/8ths of the total. The second is because you should set the autoflush option and let it flush that which is sitting in the holding disk on day one which would consist of the backups for days 5-8 in addition to the regular day 1 backup. And third, if the dumpcycle is going to be 8 days, then you need at least 16 tapes because you don't want to ever get into the situation where you are over-writing your only backup of that DLE with a new one that fails. -- Cheers, Gene AMD [EMAIL PROTECTED] 320M [EMAIL PROTECTED] 512M 99.27% setiathome rank, not too shabby for a WV hillbilly Yahoo.com attornies please note, additions to this message by Gene Heskett are: Copyright 2003 by Maurice Eugene Heskett, all rights reserved.
