On 16 Mar 2005, at 13:26, Jon LaBadie wrote:

With dumpcycle 0, each DLE is scheduled for a level 0 each run of amdump.

With "noinc", incrementals are scheduled and planned, just not done.
I.e. for a particular amdump run, nothing is done with that DLE if it is
scheduled for an incremental.

So, this config will only be run on the first on the month and should do a full dump of all disks to tape. Should I just stick with dumpcycle 0 then?


Gaby

--
Uganda Maximum - Enemy of the English Thrust
[EMAIL PROTECTED]
http://weblog.vanhegan.net



Reply via email to