> Alan Pearson wrote: > >> Now I'm faced with more difficulties because of this. >> >> Amanda is only dumping at level2 the machine it overwrote the only full >> backup of. >> >> How can I force a level 0 dump ? >> >> Cheers,
Pavel gave a response on 'how', but I'm confused as to the 'why'. If the last full dump was overwritten, shouldn't Amanda be trying to schedule a level 0 anyway, since there is no level 0 to base an incremental on? Frank -- Frank Smith [EMAIL PROTECTED] Sr. Systems Administrator Voice: 512-374-4673 Hoover's Online Fax: 512-374-4501
