[ 
https://issues.apache.org/jira/browse/AMBARI-3386?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Andrii Babiichuk updated AMBARI-3386:
-------------------------------------

    Attachment: AMBARI-3386_1.4.1.patch

> Overall progress is shown as 0% on Retry during Install phase
> -------------------------------------------------------------
>
>                 Key: AMBARI-3386
>                 URL: https://issues.apache.org/jira/browse/AMBARI-3386
>             Project: Ambari
>          Issue Type: Task
>          Components: client
>    Affects Versions: 1.4.1
>            Reporter: Andrii Babiichuk
>            Assignee: Andrii Babiichuk
>             Fix For: 1.4.1
>
>         Attachments: AMBARI-3386_1.4.1.patch, AMBARI-3386.patch
>
>
> Install cluster with multiple hosts. Installation failed on some nodes. 
> After retry, the overall progress was being shown as 0% until the install 
> phase finished. 
> Once the start phase began, the overall progress caught up to 34%.



--
This message was sent by Atlassian JIRA
(v6.1#6144)

Reply via email to