On 26/11/2026 16:00, [email protected] wrote:
Thank you for your contribution! Sashiko AI review found 3 potential
issues to consider:
- [Medium] drm/sched: drm_sched_fence_advance_start_time() advances
start_ts past end
- [Medium] drm/sched: race in drm_sched_fence_scheduled() drops start_ts
advancement
- [Low] drm/sched: wrong kernel-doc comment on
drm_sched_fence_finished_time()
--
commit 410c845aad37c46edfe8c0d12fc45e44b4afc986
Author: Tvrtko Ursulin <[email protected]>
drm/sched: Track sched fence scheduled and finished time directly
This commit records scheduled and finished timestamps directly in struct
drm_sched_fence under a dedicated spinlock instead of reading and
overwriting dma_fence.timestamp.
diff --git a/drivers/gpu/drm/scheduler/sched_fence.c
b/drivers/gpu/drm/scheduler/sched_fence.c
index 94ba0cf4fe027..5fecd3ebfffbb 100644
--- a/drivers/gpu/drm/scheduler/sched_fence.c
+++ b/drivers/gpu/drm/scheduler/sched_fence.c
@@ -65,6 +65,9 @@ static void drm_sched_fence_set_parent(struct drm_sched_fence
*s_fence,
void drm_sched_fence_scheduled(struct drm_sched_fence *fence,
struct dma_fence *parent)
{
+ ktime_t now = ktime_get();
+ unsigned long flags;
+
/* Set the parent before signaling the scheduled fence, such that,
* any waiter expecting the parent to be filled after the job has
* been scheduled (which is the case for drivers delegating waits
@@ -74,14 +77,26 @@ void drm_sched_fence_scheduled(struct drm_sched_fence
*fence,
if (!IS_ERR_OR_NULL(parent))
drm_sched_fence_set_parent(fence, parent);
- dma_fence_signal(&fence->scheduled);
+ spin_lock_irqsave(&fence->ts_lock, flags);
+ fence->start_ts = now;
+ spin_unlock_irqrestore(&fence->ts_lock, flags);
+
+ dma_fence_signal_timestamp(&fence->scheduled, now);
}
[Severity: Medium]
Can drm_sched_fence_scheduled() overwrite a start_ts advancement on an
unordered submit_wq?
drm_sched_run_job_work() adds the job to sched->pending_list in
drm_sched_job_begin() before calling run_job() and
drm_sched_fence_scheduled(). If the previous head job finishes while
this job is between drm_sched_job_begin() and acquiring fence->ts_lock:
work_run_job (next) work_free_job (prev)
drm_sched_job_begin(next)
list_add_tail(..., pending_list)
fence = run_job(next)
drm_sched_fence_scheduled()
now = ktime_get()
drm_sched_get_finished_job()
ts = ...finished_time(prev)
drm_sched_fence_advance_start_time()
/* start_ts == 0, no-op */
spin_lock(&fence->ts_lock)
fence->start_ts = now; <-- older than prev's finished_ts
The advancement to prev's finish timestamp is lost and next->s_fence
keeps the earlier timestamp, overaccounting GPU time.
I thought this wouldn't be a big deal since the delta amounts to the
lock contention period and this new lock has a super tiny scope.
Nevertheless it is easy to fix by taking the current time once the lock
is obtained.
[ ... ]
diff --git a/drivers/gpu/drm/scheduler/sched_internal.h
b/drivers/gpu/drm/scheduler/sched_internal.h
index 32d3ddb820be6..be90e55af9470 100644
--- a/drivers/gpu/drm/scheduler/sched_internal.h
+++ b/drivers/gpu/drm/scheduler/sched_internal.h
@@ -67,6 +67,47 @@ void drm_sched_fence_scheduled(struct drm_sched_fence *fence,
struct dma_fence *parent);
void drm_sched_fence_finished(struct drm_sched_fence *fence, int result);
+/**
+ * drm_sched_fence_advance_start_time - Advance scheduler fence scheduled
timestamp
+ * @fence: scheduler fence
+ * @t: time to advance to
+ *
+ * Advances the scheduler fence scheduled time to @t if the fence has already
+ * been scheduled with an older timestamp.
+ */
+static inline void
+drm_sched_fence_advance_start_time(struct drm_sched_fence *fence, ktime_t t)
+{
+ unsigned long flags;
+
+ spin_lock_irqsave(&fence->ts_lock, flags);
+ if (fence->start_ts && ktime_after(t, fence->start_ts))
+ fence->start_ts = t;
+ spin_unlock_irqrestore(&fence->ts_lock, flags);
+}
[Severity: Medium]
Can drm_sched_fence_advance_start_time() advance fence->start_ts past an
already recorded fence->finished_ts?
If a later job on sched->pending_list finishes before the head job (for
example, when run_job() returns an error or NULL for a canceled job so
drm_sched_run_job_work() immediately calls drm_sched_job_done(), or when
parent fences signal out of order), next->s_fence->finished_ts is set to
T1 while next remains queued behind the head job. When the head job
later completes at T2 > T1, drm_sched_get_finished_job() advances
next->s_fence->start_ts to T2 because drm_sched_fence_advance_start_time()
does not check fence->finished_ts.
I did not consider errors from run_job() and cancelled jobs. Let me
think about that and see if there are any pre-existing bugs in this area
too.
ktime_sub(end, start) then yields a negative duration in
drm_sched_entity_stats_job_add_gpu_time() and amdgpu_ctx_fence_time(),
subtracting from accumulated runtime and passing a negative value cast to
unsigned long into ewma_drm_sched_avgtime_add(), which wraps
stats->avg_job_us and sched->avg_job_us near ULONG_MAX.
+
+/**
+ * drm_sched_fence_finished_time - Queries the scheduler fence finished
timestamp
+ * @fence: scheduler fence
+ *
+ * Advances the scheduler fence scheduled time to @t if the fence has already
+ * been scheduled with an older timestamp.
+ *
+ * Returns: Scheduler fence finished timestamp.
+ */
[Severity: Low]
This kernel-doc body looks copy-pasted from
drm_sched_fence_advance_start_time() and refers to @t, which
drm_sched_fence_finished_time() does not take.
Mea culpa.
Tvrtko